To provide detail calculation report with detail of engineering drawings and BoQ/cost estimation, construction work method, required of tools/equipments / manpower and detail project schedule for both the option i.e. new pipeline/open channel or permanent repair for the existing
| Project No | #8 |
| Category | Project History |
| Client | PT Panca Amara Utama |
| Work Location | Banggai Ammonia, Sulawesi |
| Period | 9 Oct 2023 - 23 Oct 2023 |